Useful Civil Engineering Tips For Site Engineers:
Following are the basic civil engineering tips you should be remembered while working on a construction site.
1. Grade Of Concrete:
M5 – 1 : 4 : 8
M10 – 1 : 3 : 6
M15 – 1 : 2 : 4
M20 – 1 : 1.5 : 3
M25 – 1 : 1 : 2
2. Clear Cover To Main Reinforcement:
Footings: 50 mm
Raft Foundation (Top) : 50 mm
Raft Foundation (Bottom): 75 mm
Raft Foundation (Side) : 75 mm
Beam: 25 mm
Strap Beam: 50 mm
Column :40 mm
Slab: 15 mm
flat Slab: 20 mm
Staircase: 15 mm
Retaining Wall: 20 – 25 mm
Water Retaining Structures: 2 0- 30 mm.
Maximum water absorption by bricks – 15%
Compressive strength of bricks – 3.5 N/mm2
Density Of Bricks- 1600-1920 Kg/m3
Minimum thickness of slab – 125 mm
Dimension tolerance for cubes – +2
Maximum free fall of concrete – 1.50 m
Lapping should not be used for the bars having larger dia than 36 mm.
Binding wire required for steel reinforcement – 8 kg per MT
3 samples should be taken for every 100 m2 in core cutting test.
Maximum chair spacing – 1 m.
Minimum dia should be used in dowels rod – 12 mm.
Hook for strriups (one side) – 9D
No. of strriups = (clear span/spanning) + 1
Length of main steel in cantilever anchorage – 69D.
Minimum no. of bars in square column – 4
Minimum no. of bars in circular column – 6
Minimum dia of main bars and distributors in the slab – 8 mm.
Maximum dia of main bars and distributors in the slab – 1/8 of slab thickness.
All reinforcement should be free from mill scales, loose rust, and coats of paints, oil or any other substances.
3. Setting Time:
Initial setting time should not be less than 30 minutes.
Final setting time should not be greater than 10 hours.
4. Required Curing Days:
Super sulfate cement – 7 days
Ordinary portland cement – 10 days
Cement with minerals and admixtures – 14 days.
5. Slump Value (IS-456):
Lightly reinforced concrete: 25 – 75 mm.
Heavily reinforced concrete: 75 – 100 mm.
Trench fill : 100 – 150 mm ( for in-situ & tremie).
6. Cube Samples:
1 – 5 m3 : 1 No.
6 – 15 m3 : 2 No..
16 – 30 m3 :3 No.
31 -50 m3 : 4 No.
Above 50 m3 : 4 + 1 no. of addition for each 50 m3.
Tags: Civil Engineering Tips, Civil Engineering information.
All type building information
Thank you so much ..update more instructions plz thank you
Thank you so much sir…plz inform more updates.
Super sir
Bricks warm n
Very Informative –
Imamnaque786@gmail.com
Steel weight also send
For all steel …D2 ÷162×lenth
Exmample……
1. 8 mm: 8×8÷162=.395 kg weight 1 meter .
Like that every dia of steel we can calculate
1:4:8,which item i considered in it
Its mix design for Blinding (pcc)
1 for cement
2 for sand
4 for aggregate
1:4:6 which item i considered in it?
M5 1:5:10
M7.5 1:4:8
Hook 10D
Super sir
Thank you Pradeep.
Plz send civil site basic information…..
Thanks sir for gives information
Thanx 4ur usefull info
Thnxxx
super
Good information.
Please any job for civil engineer 7352507210
Plzz send civil site information and basic information
Nice information
Training for civil engineering in building construction sites tips
Good information in civil engineering
Nice information
Its very useful information
Good
for Training for civil engineering in building construction sites tips
for internship
Super sir.
good
i want to know fire point of all materials.
please send me mail
Sir measurement for civil engineering of buildings construction tips
how to take column L in foundatation
Highway road information add
Sir,
Dimension tolerance for cubes is – +0.2mm as per IS standard.
CUBE SAMPLES:
1 – 5 m3 : 1 Set (6nos 3 for 7days and 3 for days)
6 – 15 m3 : 2 Set
16 – 30 m3 :3 Set
31 -50 m3 : 4 Set
Above 50 m3 : 4 + 1 Set of addition for each 50 m3
Thank you sir for imformation and it is add in my knowledge
its really basic information provided here that all people persuing civil engineering must have
Tq small sir it is very useful for all nanu tumba baiskondide idela hotila antha
D information is so educative
very good information
Thank you so much
absolutely brilliant??
very useful information sir
thanks for your great guidance. this site is really very helpful for civil engineers. I’ve got you book marked to check out new stuff you post…thank you.
Thank you it is very useful for us
What is L length in column vertical bar in footing.
Any formula ?
All the details are very important.
Nice…
Thank you sir..
All details are excellent for good engineering job
Very useful information.
Hi, Really awesome and powerful points covered will back for read.
Any way do you know about Top ten construction companies in india.
nice info.
plz update new construction material.
other than conventional materials.
Thank you so much. Please update more instruction..
thank you sir please share more information
Thanks sirji it is very useful information for us
thank you for shearing valueable information.
Got to know a lot from this!
Everything was so relatable.
Thank you for sharing!